Setting out on Kazakhstan
2016-11-09
On 9th, Nov.2016, we finish the gantry crane component production and package and the delivery has already arranged to Kazakhstan.
The crane is adopted Clescrane standard package type: all the technical equipment are packed in the wooden box. The water proof cloth is added in the wooden box and the foam material is also added for the safety transportation.
The protection measures are adopted in the delivery, which includes rain-proof measure, moisture-proof measure, rust-proof measure, etc. Clescrane’ packing standard could guarantee that the equipment is brand new, when reaches the destination. Kazakhstan customers are satisfied with our service and hope we could have a long term cooperation.